ADVERTISEMENT
ORR firms discuss monsoon preparedness with civic officials During the meeting, it was decided to remove barricades from stretches where the metro work is completed and desilt the drains.
DHNS
Last Updated IST
<div class="paragraphs"><p>Metro construction, drain work, heavy traffic seen at the Outer Ring Road (ORR).&nbsp;</p></div>

Metro construction, drain work, heavy traffic seen at the Outer Ring Road (ORR). 

Credit: DH Photo/S K DINESH

Bengaluru: Following the onset of the monsoon, which is expected to worsen traffic on the city’s tech corridor, the Outer Ring Road Companies Association (ORRCA) met with civic authorities on Friday to assess various projects.

ADVERTISEMENT

Top officials from the BBMP, BWSSB, and Namma Metro attended the meeting. BBMP Chief Commissioner Tushar Girinath and BMRCL Managing Director Maheshwar Rao were among those present.

The works reviewed included the ongoing metro construction between Central Silk Board and KR Puram, development of service roads and footpaths along the ORR, maintenance of 22 major roads connecting the ring road, surface repairs of flyovers, and the construction of an underpass at Panathur.

During the meeting, it was decided to remove barricades from stretches where the metro work is completed and desilt the drains.

ADVERTISEMENT
(Published 15 June 2024, 02:33 IST)