<p>In a step forward for the suburban rail project, bids have been invited for the construction of the 25.57-km-long corridor between Benniganahalli and Chikkabanavara (Corridor 2).</p>.<p>The Rail Infrastructure Development Company (Karnataka) Limited issued a tender for the design and construction of the line under the two-cover system where companies have to qualify for the technical bid to become eligible for the financial bid.</p>.<p><strong>Also Read | <a href="https://www.deccanherald.com/state/mangaluru/track-doubling-work-between-mangaluru-junction-and-panambur-to-complete-soon-1053715.html">Track doubling work between Mangaluru Junction and Panambur to complete soon</a></strong></p>.<p>The line, named 'Mallige', comprises 8 km of the elevated corridor and 17.55 km of the at-grade corridor.</p>.<p>The work includes the construction of ramps, formation of embankments, cuttings, blanketing, major and minor bridges, retaining walls, drains and utility diversions.</p>.<p>The successful bidder has 27 months to complete the work.</p>.<p><strong>Watch the latest DH Videos here:</strong></p>
<p>In a step forward for the suburban rail project, bids have been invited for the construction of the 25.57-km-long corridor between Benniganahalli and Chikkabanavara (Corridor 2).</p>.<p>The Rail Infrastructure Development Company (Karnataka) Limited issued a tender for the design and construction of the line under the two-cover system where companies have to qualify for the technical bid to become eligible for the financial bid.</p>.<p><strong>Also Read | <a href="https://www.deccanherald.com/state/mangaluru/track-doubling-work-between-mangaluru-junction-and-panambur-to-complete-soon-1053715.html">Track doubling work between Mangaluru Junction and Panambur to complete soon</a></strong></p>.<p>The line, named 'Mallige', comprises 8 km of the elevated corridor and 17.55 km of the at-grade corridor.</p>.<p>The work includes the construction of ramps, formation of embankments, cuttings, blanketing, major and minor bridges, retaining walls, drains and utility diversions.</p>.<p>The successful bidder has 27 months to complete the work.</p>.<p><strong>Watch the latest DH Videos here:</strong></p>