Peenya flyover in Bengaluru likely to reopen to heavy vehicles in Feb
The 15-metre-wide, 4.2-km-long flyover on Tumakuru Road has been shut for buses and trucks since December 2021 after prestressed cables in its three spans gave way due to corrosion.