Water supply disruption between 10.30 am and 12.30 pm on Thursday: BWSSB
The disruption is a result of emergency repair work, which will involve replacing the 220 kV High Level Bus GOS and other equipment along the 220kV power line between the Vrishabhavathi 220 kV power plant and the Tataguni power plant.