<p class="title">A bridge, constructed on the main road in Haraga village, has developed cracks. The bridge was constructed at a cost of Rs 80 lakh by the PWD.</p>.<p class="bodytext">The bridge developing cracks within a few months of construction has made the residents doubt the quality of the work.</p>.<p class="bodytext">Soil dumped by the side of the road too has caved in and entered the water body that flows below.</p>.<p class="bodytext">Villagers Sharan and Trishul have urged the PWD engineer to visit the spot and inspect the quality of the bridge. </p>
<p class="title">A bridge, constructed on the main road in Haraga village, has developed cracks. The bridge was constructed at a cost of Rs 80 lakh by the PWD.</p>.<p class="bodytext">The bridge developing cracks within a few months of construction has made the residents doubt the quality of the work.</p>.<p class="bodytext">Soil dumped by the side of the road too has caved in and entered the water body that flows below.</p>.<p class="bodytext">Villagers Sharan and Trishul have urged the PWD engineer to visit the spot and inspect the quality of the bridge. </p>