Cabinet approves Rs 20,773.7 cr for transmission line to evacuate power from Ladakh
After an extensive field survey, the Ministry of New and Renewable Energy (MNRE) prepared a plan to set up a 13 GW Renewable Energy (RE) generation capacity along with a 12 GWh Battery Energy Storage System (BESS) in Pang, Ladakh.